Kerala Pwd Price 3 ~upd~ Access

(Project Information and Cost Estimation) is the latest web-based software used by the Kerala Public Works Department (PWD) Kerala Water Authority (KWA)

  • Price 1: This is usually the base rate (often roughly equivalent to the SOR publish rate or slightly below/above). It is typically applied to standard works in accessible areas where material transportation and labor availability are not difficult.
  • Price 2: This is an intermediate rate (often a percentage increase over Price 1). It is used for works that are somewhat remote or where market rates are higher than the base SOR.
  • Price 3: This is the highest rate among the standard categories.

Kerala PWD Price 3 (Explanation)

  1. Timber: Prices of various types of timber, including teak, rosewood, and sandalwood, are listed in Kerala PWD Price 3.
  2. Steel: Rates for steel materials, such as reinforcement bars, plates, and angles, are included in the schedule.
  3. Cement: Prices of different types of cement, including Ordinary Portland Cement (OPC) and Portland Pozzolana Cement (PPC), are listed.
  4. Labor: Rates for labor, including skilled and unskilled labor, are provided in Kerala PWD Price 3.
  5. Bricks and blocks: Prices of bricks, blocks, and other masonry materials are included in the schedule.

M-Sand (Cubic Metre)

Based on market data for the first and second quarters of 2024–2025, the following are approximate state average rates for essential materials: Material Type State Average Rate (₹) ₹2,319.01 P-Sand (Cubic Metre) ₹2,528.22 Rubble (Cubic Metre) ₹1,590.30 20mm Aggregate (3/4") ₹1,845.04 40mm Aggregate (1 1/2") ₹1,854.79 Cement (OPC/PPC) Bag (50kg) ₹345 – ₹430 Steel (TMT Bars) Metric Ton ₹63,000 – ₹73,000 kerala pwd price 3

What Exactly is ‘Price 3’?

| Issue | Clarification | |-------|----------------| | Can a contractor claim higher than Price 3? | No – unless an item is not listed in SoR (then “rate analysis” is done by the Engineer-in-Charge). | | Does Price 3 include GST? | No – GST (currently 18% for most construction materials) is added separately as per applicable tax laws. | | Is Price 3 same across all districts? | No – varies due to local royalty, transport, and availability. | | What if material is sourced beyond standard lead? | Extra lead is compensated via “lead & lift” charges, but the base rate remains Price 3. | (Project Information and Cost Estimation) is the latest

PRICE (Project Information and Cost Estimation)

Look for the portal links.

The Kerala PWD Rate/Price 3 is a valuable resource for construction professionals, providing a standardized schedule of rates for estimating costs. By understanding the components, benefits, and limitations of the schedule, users can effectively utilize it for their projects. Regular updates and revisions to the schedule ensure that it remains relevant and accurate. Price 1: This is usually the base rate